Stabilization of slopes and protection against rockfall in the town of blanca
Design, Advisor and Project Construccion
Geographical Location: BLANCA – Murcia (Spain).
Works: Three Steps. Years 2011, 2015 and 2016
Client
- Department of Environment of the Autonomous Community of the Region of Murcia
Description of the works
- Stabilization of 3.500 m2 on the slopes of the Road with a support of 60 kN/m2, through the placement of wire mesh steel with high elastic limit and bolts Φ = 40 mm and L = 6 m
- Stabilization of 3.700 m2 on the slopes of the Road with a support of 40 kN/m2, through the placement of wire mesh steel with high elastic limit and bolts Φ = 40 mm and L = 6 m
- Installation of 350 m of rockfall barrier E=1000 kJ, H=4 m
- Installation of 550 m of rockfall barrier E=3000 kJ, H=6 m
Final cost:
2.950.000 €