Works of stabilization and protection against falling of rocks on the road C-13. PK 45+000 - PK 46+471.
Analysis of Risks, Study of Solutions and Budget
Geographical Location: CAMARASA – Lleida (Spain).
Works: Years 2017
Client
Department of Roads of the Generalitat of CataluñaDescription of the works
- Stabilization of 4.500 m2 on the slopes of the Road with a support of 40 kN/m2, through the placement of wire mesh steel with high elastic limit and bolts Φ = 40 mm and L = 5 m
- Stabilization of 3.000 m2 on the slopes of the Road with a support of 60 kN/m2, through the placement of wire mesh steel with high elastic limit and bolts Φ = 40 mm and L = 6 m
- Installation of 500 m2 of drapper mesh.
- Installation of 650 m of rockfall barrier E=1000 kJ, H=4 m
- Installation of 720 m of rockfall barrier E=2000 kJ, H=5 m
- Installation of 350 m of rockfall barrier E=5000 kJ, H=7 m
Final cost:
3.200.000 €